How long does the “new” indicator show up next to a task in SharePoint 2010?

sharepoint.stackexchange https://sharepoint.stackexchange.com/questions/6466

  •  16-10-2019
  •  | 
  •  

문제

When creating a task in SharePoint 2010, the "new" indicator is shown after creating a task. How long is this displayed and is the amount of time it is displayed configurable from the GUI?

도움이 되었습니까?

해결책

By default it is displayed for 2 days. You can override it with STSADM:

http://technet.microsoft.com/en-us/library/cc287681(office.12).aspx

If you are using SharePoint 2010, you should also be able to override it using PowerShell.